亚洲欧美日韩国产精品网-亚洲欧美日韩国产精品一区-亚洲欧美日韩国产精品影院-亚洲欧美日韩国产色另类-亚洲欧美日韩国产一区二区精品-亚洲欧美日韩国产一区图片

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產與制造

24小時全國服務熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.vinciedu.com.cn

當前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 国产日韩欧美在线播放 | 亚洲精品久久久久久久网站 | 二色a v国产 | 午夜怡红院 | 欧美精品一区在线看 | 久久久伊香蕉网站 | 国产片欧美片亚洲片久久综合 | 国产精品成人久久久 | 亚洲国产精品a一区二区三区 | 91麻豆精品国产自产在线 | 岛国不卡 | 99精品国产久热在线观看66 | 欧美成人久久久免费播放 | 日本精品久久久久中文字幕 1 | 干干操 | 国产精品福利在线观看入口 | 欧美 国产 日韩 第一页 | 曰批女人视频在线观看 | 国产精品aaa | 欧美α一级毛片 | 精品国产一区二区三区久 | 97视频在线免费播放 | 日韩精品久久久久久久电影99爱 | 国产精品99久久久久久人 | 日本一区二区三区高清在线观看 | 激情丁香六月 | 成人在线观看不卡 | 亚洲成人在线网站 | 午夜日本福利 | 日韩精品久久久毛片一区二区 | 成人日韩视频 | 18禁片一级毛片视频播放免费看 | 日本免费爱爱视频 | 日韩欧美第一页 | 色悠悠网 | 精品哟哟哟国产在线观看不卡 | 超91精品手机国产在线 | 日韩欧美 在线播放 | 欧美国产成人免费观看永久视频 | 国产亚洲视频在线观看 | 亚洲成人影院在线 |